Amend CSSB 7 in Section 39.104, Utilities Code, as added by SECTION 33 of the bill (Committee Report Printing, page 17, between lines 12 and 13), by adding a new Subsection (k) to Section 39.104 to read as follows: (k) In a power region in which customer choice is delayed under Section 39.103, the commission shall establish a pilot program in accordance with the requirements prescribed by Subsections (d)-(j). The commission shall determine the duration of the pilot program and the level of participation based on the market conditions of the region.